Metal disintegrator mounted in the vertical plane, ready to cut a square drive hole in the broken portion of the stud, approximately 100mm down the clearance hole
Metal disintegrator mounted in the vertical plane,
ready to cut a square drive hole in the broken
portion of the stud, approximately 100mm down
the clearance hole.

High Speed Caramaran, Main Engine Cylinder Head Stud

SpeedFerries operate a high speed, regular fast ferry service between Dover and Boulogne. They required a broken stud to be removed from the main engine entablature.
A broken cylinder head stud usually requires reduced power from the engine and thus service timetables can suffer. SpeedFerries therefore require a fast and efficient service, where work is carried out in maintenance periods allowed for in the timetable. (usually overnight).
Foretract Engineering are able to mobilise rapidly, (often working on the same day that the operator’s engineer calls us). We carry out this service regularly for most of the fast ferry operators in the UK and no voyages have ever been delayed due to our work overrunning.

SPEED 1 at full power on the English Channel.
SPEED 1 at full power on the English Channel.

UK office > +44 (0) 17684 83669
Mobile > +44 (0) 7836 757339
Workshop Address
Foretract Engineering Ltd,
Unit 13 Blencathra Business Centre, Threlkeld, Nr Keswick, Cumbria, CA12 4TR